NM-602 over UNNAMED WATERWAY
17.0 MI S OF NM-118 · County 031, New Mexico · Built 1980 · 2 Lanes · 5,009 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.29115, -108.756328
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 46 years old.
Nearby Bridges
31-003A over UNNAMED WATERWAY
Built 1966
31-MC10 over BREAD SPRING WASH
Built 1996
IRR/CR-10 over BREAD SPRINGS WASH
Built 1992
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
31-0010 over BREAD SPRINGS WASH
Built 1992
31-Z001 over UNNAMED WATERWAY
Built 1987
IRR BIA RTE N7044 over WHITEWATER ARROYO WASH
Built 1983
IRR BIA RTE 5 over CIBOLA WASH
Built 1973
IRR BIA RTE 5 over RIO NUTRIA RIVER
Built 1973
Bridge Details
- Structure #
- 000000000008453
- Year Built
- 1980
- Length
- 18.9 m (62 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 5,009
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $191,000
- Total Project Cost
- $286,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.