HWY TOWNSEND RD over WATER MULPUS BROOK

.1 MI N OF ST-2A · County 017, Massachusetts · Built 1961 · 2 Lanes · 2,050 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
S13004260MUNNBI
Year Built
1961
Length
7.6 m (24.9 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
2,050
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$527,000
Total Project Cost
$791,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.