ST 2 A/GREAT RD over WATER MULPUS BROOK

1.1 MI W. AYER TOWN LINE · County 017, Massachusetts · Built 1941 · 2 Lanes · 6,891 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S1301326PDOTNBI
Year Built
1941
Length
8.5 m (27.9 ft)
Max Span
7 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
6,891
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$953,000
Total Project Cost
$1,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.