HWY LONGLEY RD over WATER MULPUS BROOK

.1 MI. NE. OF RT. 2A · County 017, Massachusetts · Built 2021 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S13005C3TMUNNBI
Year Built
2021
Length
16.5 m (54.1 ft)
Max Span
14 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.