HWY FRONT ST over WATER NASHUA RIVER

HARVARD-SHIRLEY TL · County 027, Massachusetts · Built 1948 · 2 Lanes · 6,533 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
H090081K7MUNNBI
Year Built
1948
Reconstructed
1983
Length
67.7 m (222.1 ft)
Max Span
24.4 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,533
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,711,000
Total Project Cost
$10,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.