HWY JACKSON RD over WATER NASHUA RIVER

@EXIT 106/0.1 MI N OF ST2 · County 027, Massachusetts · Built 1942 · 2 Lanes · 8,836 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
H0901923VDOTNBI
Year Built
1942
Reconstructed
1983
Length
35.1 m (115.2 ft)
Max Span
16.5 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
8,836
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,151,000
Total Project Cost
$3,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.