ST 2 over HWY DEPOT ST

.9 MI. W. OF ST 110&111 · County 027, Massachusetts · Built 1951 · 4 Lanes · 52,262 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H090181PEDOTNBI
Year Built
1951
Length
11.9 m (39 ft)
Max Span
9.8 m
Width
27.2 m (89.2 ft)
Lanes
4
Daily Traffic
52,262
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,119,000
Total Project Cost
$3,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.