ST 2 A/FTCHBRG RD over WATER NASHUA RIVER

AT AYER SHIRLEY TOWN LINE · County 017, Massachusetts · Built 1975 · 2 Lanes · 6,959 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A1900226LDOTNBI
Year Built
1975
Length
37.5 m (123 ft)
Max Span
36.6 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
6,959
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$721,000
Total Project Cost
$1,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.