ST225 W MAIN ST over WATER NASHUA RIVER

0.8 MI W RT 111 · County 017, Massachusetts · Built 1930 · 2 Lanes · 4,648 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G1400328GDOTNBI
Year Built
1930
Length
28.7 m (94.2 ft)
Max Span
13.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
4,648
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,958,000
Total Project Cost
$2,938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.