ST111 PLEASANT ST over OTHER DEM RAIL TRAIL
0.3 MI S OF ST-119 · County 017, Massachusetts · Built 2002 · 2 Lanes · 5,142 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.609658, -71.578008
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
HWY PEABODY ST over OTHER DEM RAIL TRAIL
Built 2002
ST225 W MAIN ST over WATER NASHUA RIVER
Built 1930
ST119 SOUTH RD over WATER NASHUA RIVER
Built 1931
ST119 SOUTH ST over WATER NASHUA RIVER TRIB
Built 1910
ST225 GROTON RD over WATER SQUANNACOOK RIVER
Built 1996
ST 2 A/FTCHBRG RD over WATER NASHUA RIVER
Built 1975
ST 2 A/E MAIN ST over RR MBTA / BMRR
Built 1949
ST 2 A/GREAT RD over WATER MULPUS BROOK
Built 1941
HWY W MAIN ST over COMB MBTA/BM & ACCS RD
Built 1996
ST113 MAIN ST over WATER NASHUA RIVER
Built 1937
Bridge Details
- Structure #
- G140087XCDOT634
- Year Built
- 2002
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 5,142
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $856,000
- Total Project Cost
- $1,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.