ST111 PLEASANT ST over OTHER DEM RAIL TRAIL

0.3 MI S OF ST-119 · County 017, Massachusetts · Built 2002 · 2 Lanes · 5,142 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
G140087XCDOT634
Year Built
2002
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
5,142
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$856,000
Total Project Cost
$1,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.