ST113 MAIN ST over WATER NASHUA RIVER
0.1 MI ELY CANAL ST · County 017, Massachusetts · Built 1937 · 2 Lanes · 12,478 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
42.665344, -71.575647
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 89 years old.
Nearby Bridges
HWY GROTON ST over WATER NASHUA RIVER
Built 1962
HWY MILL ST over WATER NISSITISSIT RIVER
Built 2012
ST111 HOLLIS ST over WATER NISSITISSIT RIVER
Built 1958
HWY PRESCOTT ST over WATER NISSITISSIT RIVER
Built 1994
ST119 SOUTH ST over WATER NASHUA RIVER TRIB
Built 1910
ST119 SOUTH RD over WATER NASHUA RIVER
Built 1931
NH111 over NASHUA RIVER
Built 1950
WEST HOLLIS ROAD over NISSITISSIT RIVER
Built 1978
ST111 PLEASANT ST over OTHER DEM RAIL TRAIL
Built 2002
HWY MAIN ST over WATER SALMON BROOK
Built 2014
Bridge Details
- Structure #
- P06002283DOTNBI
- Year Built
- 1937
- Reconstructed
- 1976
- Length
- 82.9 m (272 ft)
- Max Span
- 20 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 12,478
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,790,000
- Total Project Cost
- $10,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.