HWY MAIN ST over WATER SALMON BROOK
.5 MI. N. OF RTE 113 · County 017, Massachusetts · Built 2014 · 2 Lanes · 2,700 vehicles/day
Overall
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.678203, -71.493403
This bridge is in worse condition than 7.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 12 years old.
Nearby Bridges
RIDGE ROAD over SALMON BROOK
Built 1998
SEARLES ROAD over SALMON BROOK
Built 1999
HWY LOCUST AVE over US 3
Built 2004
ST113 KENDALL RD over US 3
Built 2004
ST 3 SB over US 3 SB CONNECTOR
Built 2004
ST 3 NB over US 3 SB CONNECTOR
Built 2004
US 3 CD ROAD over SPIT BROOK ROAD
Built 1993
US 3 FEE TPK SB over SPIT BROOK ROAD
Built 1995
US 3 FEE TPK NB over SPIT BROOK ROAD
Built 1993
NEW SEARLES ROAD over SALMON BROOK
Built 1999
Bridge Details
- Structure #
- D13001BLGMUNNBI
- Year Built
- 2014
- Length
- 6.7 m (22 ft)
- Max Span
- 6.6 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,700
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $531,000
- Total Project Cost
- $797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.