US 3 FEE TPK NB over SPIT BROOK ROAD

0.5 MI FROM MASS SL. · County 011, New Hampshire · Built 1993 · 3 Lanes · 46,106 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017701460003700
Year Built
1993
Length
45.7 m (149.9 ft)
Max Span
43.9 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
46,106
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.