FEE TPK SB ON RAMP over FEE TPK SB OFF RAMP
1 MI N MASS SL · County 011, New Hampshire · Built 1995 · 2 Lanes · 9,004 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.7174, -71.451203
This bridge is in worse condition than 27% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 31 years old.
Nearby Bridges
C-D ROAD over RAMP D TOLL ACCESS DR
Built 1996
CIRC HWY EB over DANIEL WEBSTER HWY
Built 1993
FEE TPK NB ON RAMP over FEE TPK SB OFF RAMPS
Built 1996
FEE TPK NB OFFRAMP over FEE TPK SB OFF RAMP
Built 2000
FEE TPK SB RAMP over FEE TPK SB OFF RAMPS
Built 1996
CIRC HWY WB over DANIEL WEBSTER HWY
Built 1993
RAMP H over FEE TPK
Built 1993
US 3 FEE TPK NB over SPIT BROOK ROAD
Built 1993
US 3 FEE TPK SB over SPIT BROOK ROAD
Built 1995
US 3 CD ROAD over SPIT BROOK ROAD
Built 1993
Bridge Details
- Structure #
- 017701430004900
- Year Built
- 1995
- Length
- 53.9 m (176.8 ft)
- Max Span
- 52.4 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,004
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.