RAMP H over FEE TPK

AT EXIT 2 · County 011, New Hampshire · Built 1993 · 2 Lanes · 9,004 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017701450005600
Year Built
1993
Length
252.4 m (828.1 ft)
Max Span
53.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
9,004
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.