US 3 CD ROAD over SPIT BROOK ROAD

0.5 MI NORTH MASS SL · County 011, New Hampshire · Built 1993 · 2 Lanes · 4,911 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017701470003700
Year Built
1993
Length
45.4 m (149 ft)
Max Span
43.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
4,911
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.