ST 3 NB over US 3 SB CONNECTOR

0.25 M SLY N.H. LINE · County 017, Massachusetts · Built 2004 · 3 Lanes · 48,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
T0902284YDOTNBI
Year Built
2004
Length
37.4 m (122.7 ft)
Max Span
36.9 m
Width
24.2 m (79.4 ft)
Lanes
3
Daily Traffic
48,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$598,000
Total Project Cost
$898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.