ST113 KENDALL RD over US 3

RT 113 AT RT 3 · County 017, Massachusetts · Built 2004 · 4 Lanes · 13,448 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
T09014AYDDOTNBI
Year Built
2004
Length
90.6 m (297.2 ft)
Max Span
44.3 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
13,448
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,978,000
Total Project Cost
$4,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.