ST225 GROTON RD over WATER SQUANNACOOK RIVER
AT SHIRLY-GROTON T.L. · County 017, Massachusetts · Built 1996 · 2 Lanes · 34,059 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.602903, -71.627592
This bridge is in worse condition than 49.9% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 30 years old.
Nearby Bridges
ST225 W MAIN ST over WATER NASHUA RIVER
Built 1930
HWY LONGLEY RD over WATER MULPUS BROOK
Built 2021
HWY TOWNSEND RD over WATER MULPUS BROOK
Built 1961
ST 2 A/FTCHBRG RD over WATER NASHUA RIVER
Built 1975
ST 2 A/GREAT RD over WATER MULPUS BROOK
Built 1941
ST119 SOUTH ST over WATER NASHUA RIVER TRIB
Built 1910
ST119 SOUTH RD over WATER NASHUA RIVER
Built 1931
HWY CROSS ST over WATER MULPUS BROOK
Built 1997
ST111 PLEASANT ST over OTHER DEM RAIL TRAIL
Built 2002
HWY PEABODY ST over OTHER DEM RAIL TRAIL
Built 2002
Bridge Details
- Structure #
- G1400128FDOTNBI
- Year Built
- 1996
- Length
- 22.3 m (73.2 ft)
- Max Span
- 20.9 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 34,059
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,658,000
- Total Project Cost
- $2,488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.