HWY CATACNEMG RD over WATER CATACUNEMAUG BROOK

.8 M. N. OF LEOMINSTER RD · County 017, Massachusetts · Built 2002 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
S13014AGQMUNNBI
Year Built
2002
Length
7 m (23 ft)
Max Span
3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$720,000
Total Project Cost
$1,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.