HWY TOWNSND HRBR over WATER MULPUS BROOK

.7 MI NE OF RT 2-A · County 027, Massachusetts · Built 1937 · 2 Lanes · 3,352 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L170081CKMUNNBI
Year Built
1937
Reconstructed
1994
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
3,352
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$748,000
Total Project Cost
$1,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.