ST 2 A/LNENBRG ST over WATER BAKER BROOK

100 FT E OF J. FITCH HWY · County 027, Massachusetts · Built 1954 · 2 Lanes · 16,255 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
F040451KQDOTNBI
Year Built
1954
Length
11.3 m (37.1 ft)
Max Span
9.5 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
16,255
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,879,000
Total Project Cost
$4,319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.