ST 2 A/WATER ST over COMB BOULDER DR & BMRR

JUST N OF ST-12 · County 027, Massachusetts · Built 1900 · 4 Lanes · 16,708 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
2
Critical
Substructure
5
Fair

Bridge Details

Structure #
F0401723NDOT634
Year Built
1900
Reconstructed
1954
Length
60.4 m (198.2 ft)
Max Span
16.8 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
16,708
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,717,000
Total Project Cost
$25,076,000