HWY PUTNAM ST over RR BMRR

.2 MILES SOUTH OF MAIN ST · County 027, Massachusetts · Built 1899 · 2 Lanes · 3,462 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F0403923QDOT634
Year Built
1899
Reconstructed
1988
Length
22.3 m (73.2 ft)
Max Span
20.7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
3,462
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,971,000
Total Project Cost
$2,957,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.