PAULSON RD over PABLO A CANAL 034
5M S POLSON · County 047, Montana · Built 2024 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.620267, -114.188133
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 2 years old.
Nearby Bridges
SEIFERT RD over PABLO A CANAL 083
Built 1960
STASSO ROAD over PABLO CANAL 37A4
Built 2020
LEIGHTON RD over PABLO CANAL 37A
Built 2018
LIGHT RD over PABLO 31A CANAL 036
Built 2009
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
CARBINE RD over PABLO CANAL 026
Built 2024
SKYLINE DR over PABLO 3A CANAL 038
Built 2013
GLOVER RD over PABLO 3A CANAL 037
Built 1985
KERR DAM RD over IRRIGATION CANAL
Built 1995
Bridge Details
- Structure #
- 000000202403296
- Year Built
- 2024
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.4 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.