KERR DAM RD over IRRIGATION CANAL
2M SW POLSON · County 047, Montana · Built 1995 · 2 Lanes · 2,737 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.666186, -114.189372
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 31 years old.
Nearby Bridges
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
IRR - US 93 over FLATHEAD RIVER
Built 1966
SKYLINE DR over PABLO FEEDER CANAL 040
Built 2011
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
PAULSON RD over PABLO A CANAL 034
Built 2024
SEIFERT RD over PABLO A CANAL 083
Built 1960
STASSO ROAD over PABLO CANAL 37A4
Built 2020
SCHAEFER RD over PABLO FEEDER CANAL 086
Built 1985
FORD RD over PABLO FEEDER CANAL 072
Built 2017
GLOVER RD over PABLO 3A CANAL 037
Built 1985
Bridge Details
- Structure #
- S00354002+09501
- Year Built
- 1995
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,737
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.