IRR - US 93 over FLATHEAD RIVER
POLSON · County 047, Montana · Built 1966 · 2 Lanes · 8,557 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
47.694364, -114.164778
This bridge is in worse condition than 75% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 60 years old.
Nearby Bridges
SKYLINE DR over PABLO FEEDER CANAL 040
Built 2011
KERR DAM RD over IRRIGATION CANAL
Built 1995
US 93 over WILDLIFE UNDERPASS
Built 2006
US 93 over WILDLIFE UNDERPASS
Built 2006
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
SCHAEFER RD over PABLO FEEDER CANAL 086
Built 1985
IRR - US 93 over PABLO FEEDER CANAL
Built 2006
FORD RD over PABLO FEEDER CANAL 072
Built 2017
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
GLOVER RD over PABLO 3A CANAL 037
Built 1985
Bridge Details
- Structure #
- P00005061+01811
- Year Built
- 1966
- Length
- 468.4 m (1536.7 ft)
- Max Span
- 18.9 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 8,557
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.