N RESEVOIR RD over PABLO FEEDER CANAL 085
5M S POLSON · County 047, Montana · Built 2009 · 2 Lanes · 873 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
47.649456, -114.1706
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 17 years old.
Nearby Bridges
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
KERR DAM RD over IRRIGATION CANAL
Built 1995
PAULSON RD over PABLO A CANAL 034
Built 2024
SKYLINE DR over PABLO FEEDER CANAL 040
Built 2011
GLOVER RD over PABLO 3A CANAL 037
Built 1985
STASSO ROAD over PABLO CANAL 37A4
Built 2020
LIGHT RD over PABLO 31A CANAL 036
Built 2009
LEIGHTON RD over PABLO CANAL 37A
Built 2018
SEIFERT RD over PABLO A CANAL 083
Built 1960
FORD RD over PABLO FEEDER CANAL 072
Built 2017
Bridge Details
- Structure #
- L24005002+09001
- Year Built
- 2009
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 873
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.