SKYLINE DR over PABLO 3A CANAL 039
3M S POLSON · County 047, Montana · Built 2015 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.640103, -114.143258
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 11 years old.
Nearby Bridges
GLOVER RD over PABLO 3A CANAL 037
Built 1985
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
LIGHT RD over PABLO 31A CANAL 036
Built 2009
LEIGHTON RD over PABLO CANAL 37A
Built 2018
FORD RD over PABLO FEEDER CANAL 072
Built 2017
SKYLINE DR over PABLO FEEDER CANAL 040
Built 2011
SCHAEFER RD over PABLO FEEDER CANAL 086
Built 1985
STASSO ROAD over PABLO CANAL 37A4
Built 2020
IRR - US 93 over PABLO FEEDER CANAL
Built 2006
PAULSON RD over PABLO A CANAL 034
Built 2024
Bridge Details
- Structure #
- L24065000+05001
- Year Built
- 2015
- Length
- 16.8 m (55.1 ft)
- Max Span
- 15.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $97,000
- Total Project Cost
- $146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.