LEIGHTON RD over PABLO CANAL 37A
2M NW PABLO · County 047, Montana · Built 2018 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.614936, -114.155964
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 8 years old.
Nearby Bridges
LIGHT RD over PABLO 31A CANAL 036
Built 2009
STASSO ROAD over PABLO CANAL 37A4
Built 2020
SKYLINE DR over PABLO 3A CANAL 038
Built 2013
PAULSON RD over PABLO A CANAL 034
Built 2024
GLOVER RD over PABLO 3A CANAL 037
Built 1985
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
SEIFERT RD over PABLO A CANAL 083
Built 1960
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
US 93 over MUD CREEK
Built 2007
OLD US HWY 93 over MUD CREEK 097
Built 2007
Bridge Details
- Structure #
- 000000000003264
- Year Built
- 2018
- Length
- 16.9 m (55.4 ft)
- Max Span
- 16.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.