SKYLINE DR over PABLO 3A CANAL 038
4M S POLSON · County 047, Montana · Built 2013 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.602325, -114.136264
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 13 years old.
Nearby Bridges
LIGHT RD over PABLO 31A CANAL 036
Built 2009
LEIGHTON RD over PABLO CANAL 37A
Built 2018
US 93 over MUD CREEK
Built 2007
US 93 over MUD CREEK
Built 2008
OLD US HWY 93 over MUD CREEK 097
Built 2007
GLOVER RD over PABLO 3A CANAL 037
Built 1985
STASSO ROAD over PABLO CANAL 37A4
Built 2020
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
PAULSON RD over PABLO A CANAL 034
Built 2024
SEIFERT RD over PABLO A CANAL 083
Built 1960
Bridge Details
- Structure #
- L24065002+02001
- Year Built
- 2013
- Length
- 12.4 m (40.7 ft)
- Max Span
- 10.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.