SEIFERT RD over PABLO A CANAL 083
6M SW POLSON · County 047, Montana · Built 1960 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
47.616628, -114.199564
This bridge is in worse condition than 89.7% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 66 years old.
Nearby Bridges
PAULSON RD over PABLO A CANAL 034
Built 2024
STASSO ROAD over PABLO CANAL 37A4
Built 2020
LEIGHTON RD over PABLO CANAL 37A
Built 2018
CARBINE RD over PABLO CANAL 026
Built 2024
LIGHT RD over PABLO 31A CANAL 036
Built 2009
N RESEVOIR RD over PABLO FEEDER CANAL 085
Built 2009
SKYLINE DR over PABLO 3A CANAL 039
Built 2015
SKYLINE DR over PABLO 3A CANAL 038
Built 2013
KAISER RD over PABLO CANAL 031
Built 2014
GLOVER RD over PABLO 3A CANAL 037
Built 1985
Bridge Details
- Structure #
- L24124005+05001
- Year Built
- 1960
- Reconstructed
- 2016
- Length
- 11.9 m (39 ft)
- Max Span
- 5.8 m
- Width
- 5.3 m (17.4 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $85,000
- Total Project Cost
- $128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.