CARBINE RD over PABLO CANAL 026
4M W PABLO · County 047, Montana · Built 2024 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.5878, -114.2132
This bridge is in worse condition than 28.4% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 2 years old.
Nearby Bridges
KAISER RD over PABLO CANAL 031
Built 2014
SEIFERT RD over PABLO A CANAL 083
Built 1960
PAULSON RD over PABLO A CANAL 034
Built 2024
STASSO ROAD over PABLO CANAL 37A4
Built 2020
LEIGHTON RD over PABLO CANAL 37A
Built 2018
LIGHT RD over PABLO 31A CANAL 036
Built 2009
SKYLINE DR over PABLO 3A CANAL 038
Built 2013
US 93 over MUD CREEK
Built 2007
OLD US HWY 93 over MUD CREEK 097
Built 2007
US 93 over MUD CREEK
Built 2008
Bridge Details
- Structure #
- 000000202403266
- Year Built
- 2024
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.3 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.