ST 24 over RR MBTA/CSX

CSX MP QNB 14.29 N OF 140 · County 005, Massachusetts · Built 1950 · 6 Lanes · 68,317 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
T010473MQDOTNBI
Year Built
1950
Length
8.5 m (27.9 ft)
Max Span
7.3 m
Width
37.8 m (124 ft)
Lanes
6
Daily Traffic
68,317
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$379,000
Total Project Cost
$569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.