ST 24 over RR MACRR

.1 MI N OF BERKLEY T.L. · County 005, Massachusetts · Built 1950 · 4 Lanes · 50,018 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
T010453MNDOTNBI
Year Built
1950
Length
9.4 m (30.8 ft)
Max Span
8 m
Width
41.3 m (135.5 ft)
Lanes
4
Daily Traffic
50,018
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$537,000
Total Project Cost
$806,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.