HWY COUNTY ST over COMB ST140&STEVEN STEXT

AT MALL FORMER W STEVENS · County 005, Massachusetts · Built 1991 · 4 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

41.867869, -71.049372

This bridge is in worse condition than 33.3% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
T010623YEDOTNBI
Year Built
1991
Length
100.6 m (330.1 ft)
Max Span
37.5 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,915,000
Total Project Cost
$14,873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.