HWY GAL MALL DR over WATER COTLEY RIVER

AT SHOPPING MALL · County 005, Massachusetts · Built 1991 · 4 Lanes · 357 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
T010633YGDOTNBI
Year Built
1991
Length
9.3 m (30.5 ft)
Max Span
9.2 m
Lanes
4
Daily Traffic
357
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,066,000
Total Project Cost
$1,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.