HWY STEVENS ST over RR MBTA/CSX

MP QNB 14.8 · County 005, Massachusetts · Built 1995 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
T0100140WDOT634
Year Built
1995
Length
30.2 m (99.1 ft)
Max Span
11.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
3,300
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,234,000
Total Project Cost
$3,352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.