ST 24 over WATER TAUNTON RIVER

AT TAUNTON TL · County 005, Massachusetts · Built 1951 · 3 Lanes · 109,526 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
R020123MRDOTNBI
Year Built
1951
Reconstructed
2016
Length
69.5 m (228 ft)
Max Span
38.4 m
Width
35.3 m (115.8 ft)
Lanes
3
Daily Traffic
109,526
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.