HWY ORCHARD ST over ST 24

.3M NW OF ST 44 · County 005, Massachusetts · Built 1952 · 2 Lanes · 10,345 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
R020163X0DOTNBI
Year Built
1952
Length
58.1 m (190.6 ft)
Max Span
27.4 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
10,345
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,635,000
Total Project Cost
$6,953,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.