ST104 S MAIN ST over WATER FORGE RIVER

1 MI NE OF US 44 · County 005, Massachusetts · Built 1965 · 2 Lanes · 13,190 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
R020013VGDOTNBI
Year Built
1965
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
2
Daily Traffic
13,190
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.