ST140 SUMMER ST over RR MACRR

.4 MI SE OF DEAN ST US 44 · County 005, Massachusetts · Built 1850 · 2 Lanes · 15,776 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
T0100940VDOT634
Year Built
1850
Reconstructed
2005
Length
9.1 m (29.9 ft)
Max Span
8.1 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
15,776
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$624,000
Total Project Cost
$937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.