ST140 WASHNGTON ST over WATER MILL RIVER

.1 MI NE OF TREMONT ST · County 005, Massachusetts · Built 2016 · 4 Lanes · 17,538 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
T01015BHKDOTNBI
Year Built
2016
Length
23.6 m (77.4 ft)
Max Span
22.5 m
Width
21.8 m (71.5 ft)
Lanes
4
Daily Traffic
17,538
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,338,000
Total Project Cost
$3,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.