ST138 WEIR ST over WATER MILL RIVER

.1 MI S OF US 44 · County 005, Massachusetts · Built 1947 · 2 Lanes · 16,422 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
T010123WFDOTNBI
Year Built
1947
Length
12.5 m (41 ft)
Max Span
10.7 m
Width
18.5 m (60.7 ft)
Lanes
2
Daily Traffic
16,422
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,562,000
Total Project Cost
$2,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.