HWY COHANNET ST over WATER MILL RIVER

AT GAZZETTE BUILDING · County 005, Massachusetts · Built 1850 · 2 Lanes · 5,357 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
T010143K3MUNNBI
Year Built
1850
Reconstructed
1950
Length
14.9 m (48.9 ft)
Max Span
13.7 m
Width
19.7 m (64.6 ft)
Lanes
2
Daily Traffic
5,357
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,919,000
Total Project Cost
$2,879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.