HWY SOUTH ST E over WATER TAUNTON RIVER

RAYNHAM-TAUNTON TOWNLINE · County 005, Massachusetts · Built 1945 · 2 Lanes · 17,068 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
R020033M4MUNNBI
Year Built
1945
Length
29 m (95.1 ft)
Max Span
13.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
17,068
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$5,469,000
Total Project Cost
$8,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.