ST 24 over ST140 COUNTY ST

AT ST 140 · County 005, Massachusetts · Built 1951 · 6 Lanes · 50,018 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
T010463MPDOTNBI
Year Built
1951
Length
32.8 m (107.6 ft)
Max Span
31.4 m
Width
23.9 m (78.4 ft)
Lanes
6
Daily Traffic
50,018
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,671,000
Total Project Cost
$17,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.