HWY CEDAR ST over RR MBTA/BMRR

1.9 KM NW OF JCT SR28&38 · County 017, Massachusetts · Built 1999 · 2 Lanes · 9,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S17012AE7DOT634
Year Built
1999
Length
23.7 m (77.8 ft)
Max Span
22.2 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
9,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,839,000
Total Project Cost
$2,759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.