HWY LOWELL ST over RR BMRR SPUR

1.5 MI SW OF JCT SR28&38 · County 017, Massachusetts · Built 1910 · 2 Lanes · 5,825 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S170153GGDOT634
Year Built
1910
Reconstructed
2006
Length
14.6 m (47.9 ft)
Max Span
13.4 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
5,825
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,450,000
Total Project Cost
$2,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.