ST 2 A/MASS AVE over RR MBTA/BMRR

.8 KM SE OF JCT SR2A&16 · County 017, Massachusetts · Built 1899 · 4 Lanes · 22,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C010123FUDOT634
Year Built
1899
Reconstructed
1986
Length
11.4 m (37.4 ft)
Max Span
9.9 m
Width
28.7 m (94.2 ft)
Lanes
4
Daily Traffic
22,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,236,000
Total Project Cost
$3,355,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.